Associated Environmental Consultants Inc. assisted Advanced Energy Systems with a Water Act application to construct a 9 MW run-of-river hydroelectric facility on South Cranberry Creek, 26 km south of Revelstoke, B.C.
The South Cranberry facility was constructed and began operation in December 2007.
Since then, we have assisted with the completion of post-construction monitoring requirements based on the Fisheries Act authorization for the project. The studies range from 5 to 15 years in duration, and include monitoring riparian revegetation survival. Riparian compensation requirements include a 2:1 replacement of areas permanently impacted by the project and the 1:1 revegetation of areas temporarily impacted by construction. Tree and shrubs were planted at a density of one tree per 9 m2, and one shrub per 1 m2. Plant survival was monitored until 90% survival was reached.


Project Highlights
Our team conducted survival rate counts and replaced dead and dying plants in years 1 and 2 of the monitoring program. In years 3 to 6, plant growth was too dense to accurately estimate survival, so monitoring methods shifted to estimating overall stem density of revegetated areas by establishing plots and completing stem counts of live trees and shrubs. The survival success rates continue to increase at this ongoing project.
More Environmental Projects
See all projects

Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments

Environmental
Phase I Environmental Site Assessment of 10 Housing Units

Environmental
Francis Cooke Landfill Operations Plan

Infrastructure
Roads and Drainage Construction, Lake Babine Nation

Environmental
Meadow Valley Groundwater Availability Study

Environmental
Kelowna Airport Soil Salvage and Enhancement Strategy

Infrastructure
Miette Hot Springs Culvert and Bridge Replacement

Transportation
Edmonton Valley Line – Stage 1

Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design

Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill

Environmental Assessment
Highland Valley Copper Mine, Environmental Impact Assessment

Transportation
2021 Flood Recovery – Nicomen Community Bridge Planning Study

Environmental Assessment
Phase I Environmental Site Assessment

Environmental
Sicamous to Armstrong Rail Trail Agricultural Component

Environmental
Okanagan Valley Drought Planning
LEADERSHIP INSIGHTS
See all insights