The Water Security Agency engaged Associated Engineering to prepare a design and tender package for the required upgrades to the first 3.2 kilometres of canal in the Saskatoon South East Water Supply System, immediately east of the Broderick Reservoir.
The rehabilitation design of the canal was completed using a fast-tracked, modified progressive delivery approach, in collaboration with Agenct representatives, to meet the extremely short timeline from design initiation to tender ready. The design includes a capacity upgrade of approximately 30% to 8.2 cubic metres per second, incorporation of a geotextile liner and rock armour, turn-out, cross drain, and drain inlet replacements, and modifications to check structures.
Project Highlights
More Infrastructure Projects
See all projects
Infrastructure
Baxter Bridge Rehabilitation
Infrastructure
Tłı̨chǫ All-Season Road – Financial Advisory Services
Bridges
Engineering services for Houston Forest Products
Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion
Transportation
Broadway Street Improvements
Land Development
Lethbridge Crossings Development
Infrastructure
Medicine Hat Sidewalk Inventory and Asset Management Program
Infrastructure
Wildfire Infrastructure Rehabilitation Program
Water
Fort Chipewyan Water Treatment Plant Expansion
Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study
Infrastructure
Burnaby Lake Rowing Club Pavilion Floating Dock
Bridges
Moody Street Overpass
Infrastructure
Rosehill Reservoir Rehabilitation
Transit
SkyTrain Fraser River Crossing North Approach Spans
Containment Systems