Associated Engineering provided construction engineering services to Surespan Construction for Phase 2 of the Ross River Bridge Rehabilitation.
The pedestrian suspension bridge spans the Pelly River and is approximately 200 metres long. A historic structure, it was constructed in the 1940’s to support a pipeline and later converted to a pedestrian bridge.
Phase 2 included replacement of the vertical hangers and horizontal wind cables; new suspension cable and wind cable anchor foundations; and timber truss superstructure replacement. Associated Engineering provided construction engineering services as well as alternate designs for the main cable anchor block and the wind cable deviator tower and anchorage, resulting in cost and time savings to the project.


Project Highlights
Associated Engineering provided alternate design for the foundations of the main suspension cable anchorage. The original system was based on helical screw piles, with steep batter and over 24 metre depth. Despite poor soil conditions, a different arrangement of concrete-filled driven pipe piles was successfully designed. Alternate design for the wind cable deviator tower and anchorage involved a single anchorage system using pipe piles and a steel cap plate. These alternate foundation systems minimized excavation; eliminated the need for excavation below the water table; and allowed construction to continue through the winter. Significant cost and time savings were also achieved through reduced concrete volumes and faster pile installation.
More Structures Projects
See all projects

Infrastructure
Burnaby Lake Rowing Club Pavilion Floating Dock

Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating

Transportation
Bobtail Forest Service Road Overpass

Transit
SkyTrain Crossing of South Point Drive

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement

Transportation
Regina Bypass ITS Infrastructure

Climate Change Adaptation & Mitigation
Fraser River Foreshore – Reach 9 Dyke

Building Structures
26 SW Marine Drive Commercial Development

Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection

Infrastructure
Burrard Bridge Rehabilitation

Transportation
184 Street and Yellowhead Trail Interchange

Structures
SkyTrain Grandview Cut Structural Upgrade

Structures
Close Proximity Bridge Inspections – Chilliwack Forest District and Chinnok BCTS Business Area

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services

Transportation