The City of Prince George retailed Associated Environmental to complete a preliminary investigation of an existing water supply well to determine whether the well could be used to augment water supply for a proposed new subdivision.
This required assessing the quality, quantity, and construction details of the well, and providing advice on the regulatory permitting process. As part of the project, we completed the following:
- Preformed a desktop study to review available site, climate, and relevant geological data
- Oversaw a down-hole camera survey of the well to confirm well construction details
- Supervised aquifer tests on the well and calculated the long-term sustainable yield
- Collected a representative groundwater quality sample and compared the results with Health Canada’s drinking water guidelines and Northern Health’s requirements
- Reviewed the regulatory framework under the Water Sustainability Act and Northern Health, and summarized the permitting requirements to bring the well into production
- Identified next steps, including timelines for regulatory permits and estimated costs


Project Highlights
People on this project
More Environmental Projects
See all projects

Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21

Environmental
Highway 40 Emergency Flood Reconstruction

Environmental
Environmental Assessments, Southeast BC

Contaminated Sites Management
Phase I and II Environmental Site Assessment – Margaret’s Landing Development

Environmental
Emergency Flood Damage Reduction Program

Environmental
Great Slave Lake Nutrient Risk Assessment and Treatment Improvement Options Study Fiddlers Lagoon Wastewater Treatment

Strategic Advisory Services
Climate Change Adaptation Scenario Development and Vulnerability and Risk Assessment

Soil Bioengineering
Wapiti River Gravel Bar Staking and Upper Slope Stabilization

Environmental Assessment
Highland Valley Copper Mine, Environmental Impact Assessment

Environmental
Port of Vancouver – Climate Change Adaptation

Environmental
Phase I and II Environmental Site Assessments and Compliance Audit Great Glacier Salmon Plant and Camp

Environmental
Okanagan Valley Drought Planning

Environmental
Coldstream Ranch Gravel Extraction and Reclamation Plan

Transportation
Technical Expert for Deerfoot Trail Improvements Procurement and Delivery Process

Environmental
Monthly Water Budget, Similkameen Valley Aquifer
LEADERSHIP INSIGHTS
See all insights






