The City of Hamilton retained Associated Engineering to undertake an emergency repair of the 151 Pedestrian Bridge.
The original structure had been subjected to severe chloride damage as the pedestrian walkway is salted during the winter months. Upon investigation of the structure, we found the floor system particularly at the structure ends had reached end of life and posed an operational hazard to the structure.
Associated Engineering took specific measurements and undertook a detailed analysis of the structure and determined remedial work was required to maintain operation of the structure. The expedient repair was installed and allowed the structure to remain open until its scheduled replacement.


Project Highlights
More Transportation Projects
See all projects

Environmental
Highway 40 Emergency Flood Reconstruction

Transportation
St. Albert Transportation Master Plan

Transportation
Transportation Planning and Functional Design of Burquitlam-Lougheed Neighbourhood Greenways

Infrastructure
Yoho Bridge Concrete Design

Transportation
Ioco Road / Bedwell Bay Road Improvements

Land Development
Royal Bay Subdivision

Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment

Transit
SkyTrain Crossing of South Point Drive

Transportation
Seymour Canyon Suspension Bridge

Transportation
La Biche River Bridge – Highway 63

Transportation
Canmore Bridge Management

Transportation
Yorkton Cycling Network

Transportation
Outlook Truss Bridge Assessment

Infrastructure
Dayton Street Pedestrian and Cycling Overpass

Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
LEADERSHIP INSIGHTS
See all insights