Location
Oakville, Ontario
Expertise
Infrastructure
Containment Systems
Environmental Engineering
Pump Stations
Share
For over 20 years ending in 1982, the Oakville Fourth Line Landfill in the Regional Municipality of Halton received the town’s waste.
Subsequently, the Region constructed a new toe drain and leachate pump station to more effectively manage the accumulating leachate and protect the surrounding environment. The management strategy for handling the leachate included recirculating it at the landfill and hauling the leachate off-site by tanker truck for treatment.
To eliminate the need to haul and off-load approximately 40,000 to 55,000 cubic metres of leachate per year from the closed landfill facility, the Region engaged Associated Engineering to complete the preliminary and detailed design for a new submersible wet well leachate pump station and 100 millimetre force main (twinned for redundancy), connecting the station to the adjacent Neyagawa sanitary sewer.


Project Highlights
Choosing the force main routing and pump station design involved evaluating numerous factors. These included the presence and location of contaminated fill, unforeseen waste disposal areas, boulder, debris, and refuse within the working limits. In addition, consideration was given to the variable nature of the fill material, which would be controlled by selecting a less steep trench side slope or by providing lateral support to the trench walls. Special consideration was also given to the overriding environmentally sensitive areas and minimizing adverse effects on surrounding wildlife habitats.
We also provided contract administration and inspection services throughout construction.
More Infrastructure Projects
See all projects

Transportation
Cold Lake CRISP

Infrastructure
West Edmonton Sanitary Sewer Tunnel W12

Infrastructure
Gold Bar Wastewater Treatment Plant

Infrastructure
Kennedale Snow Storage Site Development

Energy
New Central Library Direct Energy Service Connection and Energy Transfer Station

Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study

Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating

Downtown and Main Street Revitalization
Rocky Mountain House Main Street Reconstruction

Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair

Transportation
Sutherland Ave Pedestrian Bridge

Environmental
Tlichǫ Cultural Commons Digital Database

Infrastructure
Lakeshore Drive Redevelopment

Transportation
Broadway Street Improvements

Transportation
Coast Meridian Overpass

Transit
SkyTrain Fraser River Crossing North Approach Spans
LEADERSHIP INSIGHTS
See all insights