The BC Ministry of Forests, Lands and Natural Resource Operations and Alloycorp Mining (formerly Avanti Mining) have engaged Associated Engineering over the last ten year to inspect and manage the 137 metre five-span Nass River Bridge.
Following the identification of deterioration in one of the girders on the 63 metre main span during a close proximity inspection, we recommended the Ministry post the bridge for reduced loads and developed a number of strengthening schemes. As the bridge provides the only access to Avanti’s Molybdenum Mine at Kitsault, Avanti preferred a replacement option and retained Surespan Construction to deliver the project.
Given the length, weight and remote location of the bridge, a typical erection scheme using a large crane to remove the existing girders and place the new bridge superstructure was not possible. Working closely with Surespan Construction, we developed a replacement design utilizing the existing concrete piers and abutments. The bridge incorporated typical industrial bridge details and a modified precast concrete panel design to allow the development of composite action in the negative moment regions.


Project Highlights
Together, we developed an innovative bridge demolition scheme where the new steel girders were erected on the existing bridge and then supported on large head frames at each pier location. The existing glulam girders were then hung from the steel girders using steel hangers fitted with sliders, which allowed Surespan Construction to incrementally remove the glulam girders by sliding them out over the steel girders. Once the glulam girders were removed, the new steel towers were lowered onto the existing concrete piers and the girders lowered onto the towers from the head frame.
The project was successfully completed over a three-month period during the winter shutdown thereby minimizing impact on road users and Avanti Mining’s operations.
More Infrastructure Projects
See all projects

Containment Systems
Cell 3 East Halton Waste Management Site

Infrastructure
North Interceptor Sanitary Trunk

Transportation
Glenmore Dam Utility Relocation

Transportation
Sutherland Ave Pedestrian Bridge

Infrastructure
Forest Lawn Lift Station

Infrastructure
Gitwinksihlkw Water Treatment Plant

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement

Infrastructure
East Brampton Trunk Sanitary Sewer Twinning

Bridges
Muskeg River Bridge

Infrastructure
Big Dock and Water Front Area Redevelopment

Transportation
Cold Lake CRISP

Airports
Christina Lake Infrastructure Upgrading

Transportation
Coast Meridian Overpass

Infrastructure
Rosehill Reservoir Rehabilitation

Environmental Assessment
Fischer-Hallman Road Environmental Assessment
LEADERSHIP INSIGHTS
See all insights