Associated Engineering was retained by the Okanagan Nation Alliance to design and construct 5 new overshot gates at the McIntyre Dam to allow traditional sockeye salmon passage to resume beyond the structure.
Since its original construction 95 years earlier, salmon and fish passage and migration stopped at this structure.
McIntyre Dam controls water levels in Vaseux Lake and Okanagan River flows between Vaseux and Osoyoos Lakes, as part of the Okanagan Lake Regulation System (OLRS). The OLRS is owned, operated and maintained by the BC Ministry of Environment (MOE) through its Water Stewardship Division in Penticton.

Client
Okanagan Nation Alliance

Project Highlights
More Environmental Projects
See all projects

Environmental
Climate Change Risk Assessment

Environmental
Revegetation Manual Revisions

Environmental
Environmental Assessments, Southeast BC

Environmental
Coldstream Ranch Gravel Extraction and Reclamation Plan

Environmental
MacFarlane Creek Drainage Study

Environmental
Community-Based Monitoring Software Project

Contaminated Sites Management
Quinto Mine Preliminary and Detailed Site Investigations

Environmental
Splatsin Eagle River Compensation Site Identification Site

Environmental
Phase I Environmental Site Assessment of 10 Housing Units

Transportation
Highway 7 Haney Bypass Intersection Improvements

Buildings
Climate Change Risk Assessment for Buildings

Environmental
Phase II Environmental Site Assessment, Historical Downtown Whitehorse

Environmental
Big Bend Master Drainage Plan

Alternative Delivery
Pitt River Bridge

Transportation
2021 Flood Recovery – Nicomen Community Bridge Planning Study
LEADERSHIP INSIGHTS
See all insights