As part of the Regional Municipality of York’s Infrastructure Improvement Program, the Keswick Water Treatment Plant was identified as a water supply system component that required high priority rehabilitation.
The plant is one of two owned and operated by York Region that supply drinking water to the Town of Georgina and communities of Keswick and Sutton, and is a conventional filtration plant with a rated capacity of 16.2 million litres per day. The plant draws raw water from Lake Simcoe via a 600 mm diameter intake pipe located 365 metres offshore into Cook’s Bay.
The Regional Municipality of York retained Associated Engineering to provide preliminary design, detailed design, contract administration, and site inspection services. The Keswick Water Treatment Plant Upgrades was a focused rehabilitation project intended to restore rated capacity, introduce treatment and energy efficiencies, and add many years of useful life to a 30 year old water treatment plant.

Client
The Town of Georgina

Project Highlights
16.2mil
litres per day
600mm
diameter intake pipe
365m
offshore
More Water Treatment Projects
See all projects

Wastewater Collection & Storage
Live Online Water and Wastewater Operator Training

Water
Welland Water Treatment Plant

Pump Stations
Avenue H Reservoir and Pump Station

Electrical Instrumentation & Controls
Bearspaw Water Treatment Plant Electrical Upgrades

Buildings
Belle River Water Treatment Plant

Water Treatment
Island Water Treatment Plant

Infrastructure
Gitwinksihlkw Water Treatment Plant

Pump Stations
Oakville Water Purification Plant

Building Mechanical
Arbutus Water Treatment Plant

Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion

Energy
Process Energy Audits

Computational Fluid Dynamics Analysis
Process Investigation and Computation Fluid Dynamics Modeling

Water Treatment
Russell Binscarth Water Treatment Plant

Energy
Solar Photovoltaic System Installation

Water Treatment
South Fork Water Treatment Plant
LEADERSHIP INSIGHTS
See all insights