The 420 ML/d Island Water Treatment Plant provides direct filtration of Lake Ontario water for the City of Toronto.
Associated Engineering was retained by the City of Toronto to provide in-situ testing, design and construction services for various process and infrastructure improvements in the plant, as well as to provide engineering and construction services for the phase 1 upgrades to the Island Water Treatment Plant Residual Management Facility, and engineering and construction services for the ammonia, fluoride and dechlorination system upgrades.

Client
City of Toronto

Project Highlights
People on this project
More Water Treatment Projects
See all projects

Climate Change Adaptation & Mitigation
Toronto Water Quality Master Plan

Electrical Instrumentation & Controls
Solar Photovoltaic System Installation – WTP and Pumphouse

Electrical Instrumentation & Controls
Bearspaw Water Treatment Plant Electrical Upgrades

Water Treatment
South Fork Water Treatment Plant

Water Treatment
Glenmore Water Treatment Plant Upgrades

Water
Japan Gulch Ultraviolet Disinfection Facility

Water Treatment
Russell Binscarth Water Treatment Plant

Pump Stations
Avenue H Reservoir and Pump Station

Computational Fluid Dynamics Analysis
E.L. Smith Water Treatment Plant Upgrade

Irrigation
Red Deer Water Treatment Plant Intake

Environmental
Climate Change Risk Assessment

Computational Fluid Dynamics Analysis
Process Investigation and Computation Fluid Dynamics Modeling

Buildings
Belle River Water Treatment Plant

Water Treatment
Fairmont Chateau Lake Louise Water Treatment Plant Upgrades

Infrastructure
Gitwinksihlkw Water Treatment Plant
LEADERSHIP INSIGHTS
See all insights