The client undertook a large blasting and hauling operation as part of the infrastructure improvements supporting the Slater River Project.
NOR•EX Engineering provided safety services, ice engineering, and a road management plan for an ice crossing over the Mackenzie River, south of Norman Wells, Northwest Territories.
The client transported approximately 65-70 loads per day across the Mackenzie River, for close to 60 days, for an overall haul total of 130,000 tonnes. The program recorded zero ice related incidents during the season. The services provided improved efficiencies and cost savings for the client’s hauling program within a strong safety environment.
Client
NOR•EX Engineering
Project Highlights
65-70
transported loads per day
130,000t
for 60 days
More Infrastructure Projects
See all projects
Infrastructure
Provincial Disaster Assistance Program
Environmental
Tlichǫ Cultural Commons Digital Database
Land Development
Royal Bay Subdivision
Land Development
Lethbridge Crossings Development
Buildings
Stoney Nakoda Child & Family Services Building Assessment
Transportation
Granville Bridge Seismic Retrofit and Renewal
Infrastructure
North Kildonan Feedermain
Transportation
Still Creek Pedestrian Bridge Replacement
Infrastructure
Clayton Reservoir
Water Treatment
Russell Binscarth Water Treatment Plant
Water
Fort Chipewyan Water Treatment Plant Expansion
Climate Change Adaptation & Mitigation
Emergency Flood Damage Reduction Program
Transportation
Glenmore Dam Utility Relocation
Infrastructure
Irrigation Sustainability and Water Balance Seepage Assessment Study
Streetscaping