Location
Yellowknife, NWT
Expertise
Transportation
Ice Engineering
Share
The project was undertaken to improve transportation efficiencies on the Tibbitt to Contwoyto Winter Road (TCWR), while ensuring a high level of safety and no additional risk to winter road operators and drivers.
NOR•EX Engineering provided ice engineering design, ice loading tables, and quality assurance program for improved transportation up the TCWR to resupply three diamond mines north of Yellowknife. The project team provided the ice engineering design and overall quality assurance programs.
The enhancements saved the client 116 fewer truckloads in 2014; achieved a 5% increase in truck payload capacity until the Winter Road was operating at maximum capacity (100% Super B Gross Vehicle Weight); and provided an operational cost savings in excess of $600,000/year moving forward.
Project Highlights
More Transportation Projects
See all projects
Transportation
184 Street and Yellowhead Trail Interchange
Transportation
Highway 7 Haney Bypass Intersection Improvements
Active Transportation
Highway 1 at Mountain Highway Interchange
Transportation
Edmonton Valley Line – Stage 1
Bridges
Ironworkers Memorial Second Narrows Bridge Fatigue Study
Transit
SkyTrain Fraser River Crossing North Approach Spans
Environmental
Regulatory Application and Approvals, Valley Line LRT
Infrastructure
Johnston Canyon Campground Upgrades
Bridges
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Transportation
Pitt River Bridge
Roads
Highway 91/91A Queensborough and Howes Interchanges
Transportation
Don River Blvd. Bridge Rehabilitation
Roads
Johnson-Mariner Way Connector
Transportation
Vancouver International Airport Rainwater Harvesting
Transportation