The project was undertaken to improve transportation efficiencies on the Tibbitt to Contwoyto Winter Road (TCWR), while ensuring a high level of safety and no additional risk to winter road operators and drivers.
NOR•EX Engineering provided ice engineering design, ice loading tables, and quality assurance program for improved transportation up the TCWR to resupply three diamond mines north of Yellowknife. The project team provided the ice engineering design and overall quality assurance programs.
The enhancements saved the client 116 fewer truckloads in 2014; achieved a 5% increase in truck payload capacity until the Winter Road was operating at maximum capacity (100% Super B Gross Vehicle Weight); and provided an operational cost savings in excess of $600,000/year moving forward.


Project Highlights
More Transportation Projects
See all projects

Transportation
Bellevue Creek Bridge

Transportation
Calgary Airport Runway and Tunnel

Transportation
Vancouver International Airport Rainwater Harvesting

Transportation
Technical Expert for Deerfoot Trail Improvements Procurement and Delivery Process

Bridges
Hangingstone River Pedestrian Bridge

Transportation
Freegold Road Functional Plan

Transportation
Pioneer Pedestrian Bridge

Structures
SkyTrain Grandview Cut Structural Upgrade

Transportation
Bermuda Runway Rehabilitation

Transportation
Frank Channel and Kakisa River Bridge Assessment

Environmental
Highway 40 Emergency Flood Reconstruction

Transit
SkyTrain Fraser River Crossing North Approach Spans

Transportation
LNG Canada Heavy Haul Bridges

Transportation
170th Street over CN Rail Bridge Rehabilitations

Transportation
Glenmore Dam Utility Relocation
LEADERSHIP INSIGHTS
See all insights