The Government of the Northwest Territories retained Associated Engineering to evaluate the existing condition, load rate, and prepare life-cycle cost estimates for retrofit and replacement options for the Frank Channel and Kakisa River Bridges.
Both bridges are critical elements of the highway network in the Northwest Territories.
Associated Engineering conducted a close proximity inspection of both structures using a specialized inspection truck. Prior to conducting the inspections, a 3-D finite element model was created to evaluate the load rating based on CAN/CAS-S6-00 and identify any members that may be over-stressed or subject to high fatigue cycles. This work was then used to optimize the ultrasonic integrity inspections of the truss members.
We prepared a report that provided a Life Cycle Cost summary of the retrofit and replacement options, including total costs to 2053, salvage value, and expected residual life.

Client
The Government of the Northwest Territories

Project Highlights
More Transportation Projects
See all projects

Transportation
Kapuskasing River Bridge

Transportation
Northwest Territories ITS Program

Transportation
Bellevue Creek Bridge

Transportation
Bermuda Runway Rehabilitation

Streetscaping
Langford Cultural District

Alternative Delivery
McKay River Bridge

Structures
SkyTrain Grandview Cut Structural Upgrade

Transit
SkyTrain Fraser River Crossing North Approach Spans

Streetscaping
Nigel Valley Public Spaces

Transportation
Cold Lake CRISP

Transportation
Ironworkers Memorial Second Narrows Bridge Fatigue Study

Transportation
170th Street over CN Rail Bridge Rehabilitations

Infrastructure
Churchill Airport Runway Upgrades

Transportation
Highway 16 SAFE Corridor

Transportation
Regina Bypass ITS Infrastructure
LEADERSHIP INSIGHTS
See all insights