Location
Canmore, Alberta
Share
The Bow Valley Waste Management Commission Landfill is located in the scenic Bow Valley Corridor between Canmore and Calgary.
Associated Engineering was retained to assist the landfill owners and operators with the following tasks:
- Amendments to the landfill approval to operate by increasing the landfill’s airspace and longevity by requesting and increase in the final fill elevation.
- Reviewing profiles and sections of the landfill, along with waste types to determine the landfill’s current and future capacity to accept specific types of wastes including kiln dust from a nearby cement plant.
- Reviewing existing documentation to ascertain gaps in meeting the 2010 Standards for Landfills in Alberta, and addressing those gaps with the new approval request.
- Completing the Permit application to the local municipal district to expand the landfill to another section of landfill owned by the Commission.
- Reviewing slope and landfill capping options to maximize the landfill capacity of the new section. This includes making allowance for surface drainage and groundwater monitoring, as well as addressing potential aesthetic concerns related to neighbouring properties.
- Recommendation of planning changes to the landfill operations disposal methodology used by the Commission.
- Working with the Regulator and the Commission to address proposed changes the landfills design and operations.

Client
Bow Valley Waste Management Commission

Project Highlights
More Environmental Projects
See all projects

Containment Systems
Silverberry Secure Landfill

Environmental
Highway 40 Emergency Flood Reconstruction

Environmental Assessment
Fischer-Hallman Road Environmental Assessment

Environmental
MacFarlane Creek Drainage Study

Contaminated Sites Management
Sioux Lookout Phase I Environmental Site Assessment

Environmental
Monthly Water Budget, Similkameen Valley Aquifer

Environmental
Community Lands Engagement Study & Environmental Site Assessment

Environmental
Port of Vancouver – Climate Change Adaptation

Infrastructure
Miette Hot Springs Culvert and Bridge Replacement

Environmental
Okanagan Valley Drought Planning

Transportation
Regulatory Application and Approvals, Valley Line LRT

Infrastructure
Drainage Improvement Study

Environmental
Preliminary Well Investigation

Transportation
Edmonton Valley Line – Stage 1

Environmental
South Cranberry Creek Hydroelectric Facility Long-Term Environmental Monitoring
LEADERSHIP INSIGHTS
See all insights






