Location
Brampton, Ontario
Share
The Region of Peel determined as part of their Water and Wastewater Master Plan, that 5.6km of the existing trunk sanitary sewer between Queen Street and Highway 407 needed to be twinned to address existing and future capacity issues servicing the Town of Caledon and Brampton East developments.
The Region retained Associated Engineering to complete a Schedule “B” Environmental Assessment, detailed design and construction phase services for the twinning of the existing trunk sanitary sewer which consists of approximately 5.6 km of 1500, 1650 and 1800mm diameter trunk sanitary sewer. The alignment is located between the intersection of Queen Street and Goreway Drive to south of Highway 407 and Steeles Avenue and includes three creek crossings, a crossing of the 407ETR and a CN Rail Crossing.


Project Highlights
The design allows the existing main to remain in operation until the appropriate connections to the new system can be made. Included are three trunk sewer mains, four forcemains and six branch connections. The tendered design included 3000m of open cut installation and 2600m of trenchless installation for the new trunk sanitary sewer. The trenchless design includes microtunneling techniques.
The design incorporates early roll out of the Region’s new sanitary sewer design standards including requirements for pressure testing of the sewer line and implementation of other improved waterproofing techniques to reduce I&I.
People on this project
More Infrastructure Projects
See all projects

Transportation
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design

Transportation
St. Johns Street Redesign – Active Transportation and Pedestrian Accessibility Improvements

Transportation
Bellevue Creek Bridge

Infrastructure
Baxter Bridge Rehabilitation

Infrastructure
Agnico Eagle Heavy Haul Bridges

Infrastructure
Johnson-Mariner Way Connector

Infrastructure
Provincial Disaster Assistance Program

Infrastructure
Miette Hot Springs Culvert and Bridge Replacement

Infrastructure
Tłı̨chǫ All-Season Road – Financial Advisory Services

Bridges
Granville Bridge Seismic Retrofit and Renewal

Environmental
Port of Vancouver – Climate Change Adaptation

Infrastructure
Johnston Canyon Campground Upgrades

Streetscaping
Nigel Valley Public Spaces

Infrastructure
Greens on Gardiner

Infrastructure
Century Park
LEADERSHIP INSIGHTS
See all insights