Location
Edmonton, Alberta
Share
Associated, as part of the Edmonton Valley Line LRT design and construction team, was responsible for the identification (Alberta Tier 1 Soil and Groundwater Remediation Guidelines), quantification, and management of all contaminated soils and groundwater intersected by the 13.1 km alignment, which passes through seven known contaminated sites and numerous newly identified sites that include old landfills, gas stations, and industrial properties.
The required tasks included a review of all available Phase II reports relevant to the project development, the identification of data gaps, the preparation of supplementary soil testing plans so that adequate site-specific data were available, and the preparation of maps and cross-sections that highlight the depth and extent of contamination within the proposed works areas. The findings of this analysis were used to prepare site-specific Contamination Management Plans that detail the locations and depths of contamination, health and safety requirements (e.g., landfill gas monitoring), confirmatory sampling plans, as well as post-excavation disposal/handling strategies. Soil re-use opportunities were determined through an analysis of fill location land use and Alberta Tier 2 Soil and Groundwater Remediation Guidelines.

Client
City of Edmonton

Project Highlights
More Environmental Projects
See all projects

Infrastructure
Heavy Rainfall Event Disaster Recovery

Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21

Environmental
Data System Planning

Environmental
McIntyre Dam Fish Passage

Bridges
Haisla Bridge Replacement

Environmental
Great Slave Lake Nutrient Risk Assessment and Treatment Improvement Options Study Fiddlers Lagoon Wastewater Treatment

Water Resources
Pitt River Inter-Tidal Habitat

Environmental
Bow River Pedestrian Bridge and Utility Crossing

Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill

Infrastructure
Miette Hot Springs Culvert and Bridge Replacement

Environmental
Coldstream Ranch Gravel Extraction and Reclamation Plan

Transportation
Edmonton Valley Line – Stage 1

Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair

Environmental Assessment
Phase I Environmental Site Assessment

Environmental
Phase II Environmental Site Assessment, Historical Downtown Whitehorse
LEADERSHIP INSIGHTS
See all insights