Location
Calgary, Alberta
Expertise
Infrastructure
Urban Drainage
Share
Two weeks after the June 2013 flood, Sunnyside’s stormwater system received a rainfall that couldn’t be discharged to the Bow River, as most of the outfall gates were closed to protect the community.
The City of Calgary worked with Associated Engineering to examine this unusual flooding sequence and propose resiliency upgrades.
When historical analysis showed that high-intensity rainfall and high river levels had been independent, the team suggested an innovative dual level of service approach, substantially reducing the cost of improvements. A first for the City, this approach sets a precedent for other floodplain communities seeking cost-effective stormwater management solutions.
Client
The City of Calgary
Project Highlights
People on this project
More Infrastructure Projects
See all projects
Infrastructure
Highway 69 Twinning
Transportation
Bellevue Creek Bridge
Infrastructure
Heavy Rainfall Event Disaster Recovery
Infrastructure
Tsawwassen First Nation Sewage Treatment Plant
Transportation
Overlea Blvd. Bridge Rehabilitation
Infrastructure
North Kildonan Feedermain
Parks & Recreation
Pexsisen Elementary School
Buildings
Corix Biomass Energy Centre
Building Structures
Bone Yard Operations Centre Office Expansion
Infrastructure
Ice Engineering, Safety Services, and Road Management Plan
Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair
Streetscaping
Nigel Valley Public Spaces
Environmental
Growth and Economic Development Strategy
Parks & Recreation
North Langford Turf Field
Infrastructure
Pelham Patrol Yard Fuel Tank Replacement
LEADERSHIP INSIGHTS
See all insights