Location
Calgary, Alberta
Expertise
Infrastructure
Urban Drainage
Share
Two weeks after the June 2013 flood, Sunnyside’s stormwater system received a rainfall that couldn’t be discharged to the Bow River, as most of the outfall gates were closed to protect the community.
The City of Calgary worked with Associated Engineering to examine this unusual flooding sequence and propose resiliency upgrades.
When historical analysis showed that high-intensity rainfall and high river levels had been independent, the team suggested an innovative dual level of service approach, substantially reducing the cost of improvements. A first for the City, this approach sets a precedent for other floodplain communities seeking cost-effective stormwater management solutions.

Client
The City of Calgary

Project Highlights
People on this project
More Infrastructure Projects
See all projects

Land Development
Blackwolf Community Development

Infrastructure
Gold Bar Wastewater Treatment Plant

Energy
Site C Clean Energy

Infrastructure
Fort Chipewyan Little Lake Residential Expansion

Parks & Recreation
North Langford Turf Field

Water
Fort Chipewyan Water Treatment Plant Expansion

Transportation
Vancouver International Airport Rainwater Harvesting

Infrastructure
Melville Water Treatment Plant

Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit

Water
Jericho Reservoir

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services

Downtown and Main Street Revitalization
Rocky Mountain House Main Street Reconstruction

Building Structures
Broadview Drive Commercial Development

Infrastructure
Ice Engineering, Safety Services, and Road Management Plan

Bridges
Moody Street Overpass
LEADERSHIP INSIGHTS
See all insights










