Two weeks after the June 2013 flood, Sunnyside’s stormwater system received a rainfall that couldn’t be discharged to the Bow River, as most of the outfall gates were closed to protect the community.
The City of Calgary worked with Associated Engineering to examine this unusual flooding sequence and propose resiliency upgrades.
When historical analysis showed that high-intensity rainfall and high river levels had been independent, the team suggested an innovative dual level of service approach, substantially reducing the cost of improvements. A first for the City, this approach sets a precedent for other floodplain communities seeking cost-effective stormwater management solutions.
Client
The City of Calgary
Project Highlights
People on this project
More Infrastructure Projects
See all projects
Transit
SkyTrain Fraser River Crossing North Approach Spans
Land Development
Royal Bay Subdivision
Transportation
Granville Bridge Seismic Retrofit and Renewal
Infrastructure
Baxter Bridge Rehabilitation
Bridges
SkyTrain Grandview Cut Structural Upgrade
Hydrotechnical
Medicine Hat Flood Assistance
Infrastructure
Provincial Disaster Assistance Program
Buildings
Corix Biomass Energy Centre
Parks & Recreation
Pexsisen Elementary School
Infrastructure
West Edmonton Sanitary Sewer Tunnel W12
Infrastructure
Century Park
Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
Infrastructure
Market Crossing Commercial Development
Water
Jericho Reservoir
Pedestrian Bridges