Location
Banff, Alberta
Expertise
Share
The Town of Banff built a new pedestrian bridge over the Bow River in 2012/2013.
The bridge accommodates utility lines that move sanitary and potable water from the north side of the river to the south. As a project condition for conducting these works within Banff National Park, an Emergency Response Plan (ERP) and an Erosion and Sediment Control Plan (ESCP) were required prior to commencing construction.

Client
StructureCraft Builders Inc.

Project Highlights
Associated Environmental Consultants was contracted by StructureCraft Builders Inc. to advise and prepare these documents prior to initiating construction in the fall of 2012. The ERP was a guide designed to establish a communication plan, identify contingencies for environmental emergencies, and specify the reporting procedure for environmental emergencies. It included general guidelines for protecting water quality, fish and fish habitat, wildlife, vegetation, and historical resources.
The ESCP was based on established best management practices for erosion and sediment control. It detailed existing site conditions, identified areas of concern, and listed recommended mitigation measures and relevant best management practices.
More Environmental Projects
See all projects

Environmental
Environmental Assessments, Southeast BC

Environmental
South Cranberry Creek Hydroelectric Facility Long-Term Environmental Monitoring

Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design

Sustainable Management
Environmental Management System and Legislative Compliance Assessment

Environmental
Community Lands Engagement Study & Environmental Site Assessment

Contaminated Sites Management
Phase I and II Environmental Site Assessment – Margaret’s Landing Development

Transportation
Edmonton Valley Line – Stage 1

Infrastructure
Heavy Rainfall Event Disaster Recovery

Environmental
McIntyre Dam Fish Passage

Environmental
Monthly Water Budget, Similkameen Valley Aquifer

Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21

Environmental
Highway 40 Emergency Flood Reconstruction

Strategic Advisory Services
Climate Change Adaptation Scenario Development and Vulnerability and Risk Assessment

Environmental
Community-Based Monitoring Software Project

Environmental Assessment
Highland Valley Copper Mine, Environmental Impact Assessment
LEADERSHIP INSIGHTS
See all insights