Location
Burnaby, British Columbia
Expertise
Environmental
Climate Change Adaptation & Mitigation
Water
Hydrotechnical
Urban Drainage
Share
Associated Engineering was retained by the City of Burnaby to complete a Master Drainage Plan (MDP) to help the City to effectively manage stormwater and flooding conditions in the study area.
The Big Bend MDP focusses on the Fraser River floodplain located between Burnaby’s South Slope and the Fraser River. Drainage of the study area is affected by tidally influenced water levels in the Fraser River. In the future, climate change impacts, including changes to precipitation patterns and projected sea level rise of 1 m in magnitude or more by the year 2100, will increase the risk of flooding. The objective of the MDP is to efficiently evaluate the capacity of the existing drainage system and quantify the impact of flooding in the Big Bend study area.
Client
City of Burnaby
Project Highlights
A hydraulic 1D/2D computer model was created using MIKE-FLOOD, MIKE-URBAN and MIKE-21 FM to represent the storm system for the study area. MIKE-21 FM was used to model the major system (overland flow) in 2D. The 1D model was utilized to model components such as small and medium natural waterways, pipes, ditches, culverts, stormwater ponds, pump stations and flow control structures. The 2D model, on the other hand, contains all major topographic features, such as roads within the street network and adjacent properties, railways, channels and dikes so that overland flooding and surface conveyance will represent the current topographic condition. The benefit of this approach is that it provides the City with information on where the uncollected or surcharged water goes when it flows through the project area.
People on this project
More Environmental Projects
See all projects
Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21
Environmental
Climate Change Risk Assessment
Environmental Assessment
Liquid Waste Management Plan Environmental Impact Study
Environmental
Deh Cho Bridge, Environmental Services
Contaminated Sites Management
North Okanagan Child Care Society Phase I Environmental Site Assessment
Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments
Environmental
Port of Vancouver – Climate Change Adaptation
Environmental
Okanagan Valley Drought Planning
Environmental
Kelowna Airport Soil Salvage and Enhancement Strategy
Environmental
Coldstream Ranch Gravel Extraction and Reclamation Plan
Environmental Assessment
Environmental Assessment of Westside Road
Contaminated Sites Management
Sioux Lookout Phase I Environmental Site Assessment
Environmental
Phase II Environmental Site Assessment, Historical Downtown Whitehorse
Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound
Fish, Wildlife & Ecosystems
Regional Wildlife Monitoring Plan
LEADERSHIP INSIGHTS
See all insights