Location
Lethbridge, Alberta
Expertise
Transportation
Active Transportation
Roads
Traffic Engineering
Share
Associated Engineering has helped the City of Lethbridge join the ranks of other major Canadian cities by providing detailed design, community engagement and construction services for the City’s first bike boulevard on the beautiful and historic 7 Avenue S from 4 St S to Mayor Magrath Drive through the neighbourhoods of London Road and Victoria Park.
A bike boulevard is a roadway that has been modified to make cycling more comfortable and safer.
7 Avenue S now provides cyclists with a viable and safe route for east-west travel through the City. The west end of the corridor connects to the City’s regional pathway and the east end connects to a 4.8 km north-south separated multi-use pathway along Mayor Magrath Drive as well as Henderson Lake, the new swimming pool, Spitz Stadium and the SLP Skatepark.
Client
City of Lethbridge
Project Highlights
More Transportation Projects
See all projects
Transportation
Casino Mine Access Road
Transportation
Highway 7 Haney Bypass Intersection Improvements
Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services
Transportation
Pedestrian Bridge 151 Rehabilitation
Airports
Nanaimo Airport Airfield Electrical Upgrading
Transportation
Ray Gibbon Drive Twinning
Transit
SkyTrain Fraser River Crossing North Approach Spans
Transportation
Cold Lake CRISP
Roads
Highway 91/91A Queensborough and Howes Interchanges
Streetscaping
Vanalman Avenue Upgrades
Transportation
Coast Meridian Overpass
Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating
Transportation
184 Street and Yellowhead Trail Interchange
Infrastructure
Baxter Bridge Rehabilitation
Roads
Johnson-Mariner Way Connector
LEADERSHIP INSIGHTS
See all insights