Location
Lethbridge, Alberta
Expertise
Share
Associated Engineering has helped the City of Lethbridge join the ranks of other major Canadian cities by providing detailed design, community engagement and construction services for the City’s first bike boulevard on the beautiful and historic 7 Avenue S from 4 St S to Mayor Magrath Drive through the neighbourhoods of London Road and Victoria Park.
A bike boulevard is a roadway that has been modified to make cycling more comfortable and safer.
7 Avenue S now provides cyclists with a viable and safe route for east-west travel through the City. The west end of the corridor connects to the City’s regional pathway and the east end connects to a 4.8 km north-south separated multi-use pathway along Mayor Magrath Drive as well as Henderson Lake, the new swimming pool, Spitz Stadium and the SLP Skatepark.

Client
City of Lethbridge

Project Highlights
More Transportation Projects
See all projects

Airports
Vancouver International Airport South Airfield Upgrades

Transportation
Highway 17 at County Road 508 Interchange

Transportation
Cold Lake CRISP

Transportation
Overlea Blvd. Bridge Rehabilitation

Transportation
Sutherland Ave Pedestrian Bridge

Streetscaping
Vanalman Avenue Upgrades

Transportation
Ice Engineering and Ice Safety for Tibbitt-Contwoyto Winter Road

Transportation
Freegold Road Functional Plan

Active Transportation
Highway 1 at Mountain Highway Interchange

Transportation
Coast Meridian Overpass

Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair

Infrastructure
Johnson-Mariner Way Connector

Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection

Streetscaping
Nigel Valley Public Spaces

Transportation
Port Mann Highway 1 Improvements Highway, Structural and Drainage Engineering
LEADERSHIP INSIGHTS
See all insights










