As part of the Calgary Southwest Ring Road project, Alberta Transportation needed to construct a new stormwater management trunk sewer within the 37 Street SW right-of-way, south of Lakeview Drive SW with a new outfall to the Glenmore Reservoir / Elbow River, to replace the existing storm trunk that crosses the Tsuut’ina Nation Lands.
To meet Alberta Transportation’s schedule and in collaboration with the City, Associated Engineering as the Prime Consultant, proposed to divide the project into two phases. This approach met Alberta Transportation’s schedule and allowed the City and Associated Engineering to perform their due diligence by conducting the necessary environmental assessments in the park area. These included a biophysical impact assessment and fish habitat assessment.
Project Highlights
Contract 1, the northern portion of the project, comprised 1.4 kilometres of 2400 millimetre diameter trunk sewer from Lakeview Drive to 66 Avenue. Contract 2 spans from 66 Avenue through North Glenmore Park to the Glenmore Reservoir. Contract 2 includes 1.6 kilometres of 2400 millimetre diameter storm trunk sewer, a diversion structure to an offline oil-grit separator, a piled slope stabilization wall to support an unstable slope, an energy dissipation structure, and a new outfall to the Glenmore Reservoir.
More Environmental Projects
See all projects
Contaminated Sites Management
Quinto Mine Preliminary and Detailed Site Investigations
Transportation
Highway 7 Haney Bypass Intersection Improvements
Environmental Assessment
Environmental Assessment of Westside Road
Environmental
South Cranberry Creek Hydroelectric Facility Long-Term Environmental Monitoring
Environmental
Francis Cooke Landfill Operations Plan
Environmental
Drinking Water System Improvements in Quaaout Community
Environmental
Coldstream Ranch Gravel Extraction and Reclamation Plan
Environmental
McIntyre Dam Fish Passage
Environmental
Phase II Environmental Site Assessment, Historical Downtown Whitehorse
Environmental Assessment
Liquid Waste Management Plan Environmental Impact Study
Contaminated Sites Management
Phase I and II Environmental Site Assessment – Margaret’s Landing Development
Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound
Buildings
Corix Biomass Energy Centre
Environmental
Great Slave Lake Nutrient Risk Assessment and Treatment Improvement Options Study Fiddlers Lagoon Wastewater Treatment
Environmental Assessment
Phase I Environmental Site Assessment
LEADERSHIP INSIGHTS
See all insights