Associated Engineering logo
Project Hero Image
Expertise icon

Deltaport Container Terminal Pod 4

Location

Roberts Bank, British Columbia

Expertise

Container & Intermodal Facilities

Opened in June 1997, the Deltaport Container Terminal at Roberts Bank is a state-of-the-art terminal facility.

The $50 million, 40 hectare container terminal comprises two berths, gantry cranes, rubber tire gantries, container yard, intermodal yard, gate area, access causeway, internal roads, parking areas, and ancillary buildings.

Associated Engineering provided civil engineering design services for this project.  Our responsibilities included preliminary design, detailed design and construction inspection of grading, paving and surface drainage for the entire site including the container yard, intermodal yard, gate area, access causeway, internal roads and parking areas. Special surfacing design features for this facility include a uni-directional grading scheme with slot drains tailored to rubber tired gantry and top pick operations, reinforced concrete runways for rubber tired gantry operations integrated with slot drain crossings, and areas of roller compacted concrete pavement, as well as asphalt on granular pavement.

Map Image
Blue Section

Project Highlights

$50M

value

40ha

container terminal

Green Section

Careers

A career step in the right direction

We are recognized as one of Canada’s Best Managed Companies for 14 consecutive years but our achievements and reputation are only possible because of our amazing staff. We believe that a supported staff allows them to excel at what they do best, and provide the best possible service to our clients and communities.