Location
Calgary, Alberta
Expertise
Environmental
Climate Change Adaptation & Mitigation
Infrastructure
Water Supply, Storage, & Distribution
Water Treatment
Strategic Advisory Services
Share
The City of Calgary retained Associated Engineering to perform a water supply infrastructure climate change vulnerability assessment.
This included the entire potable water supply system from the watershed to the distribution system including dams, pump stations, treatment plants, reservoirs and piping. The study was conducted using the Engineers Canada Public Infrastructure Engineering Vulnerability Committee (PIEVC) protocol.
The purpose of the study was to identify components of the potable water supply system that are vulnerable to future (years 2020 and 2050) extreme climatic events or significant changes to baseline climate design values compared with the past data used for design. This included assessing sensitivities of infrastructure to the changes, in terms of positive or negative consequences of changes in applicable climatic conditions and, also assessing the built-in capacity of infrastructure to absorb any net negative consequences from the predicted changes in climatic conditions.
The basis of the methodology involved assessing various climate change models and superimposing that data over the design and operational characteristics of the water supply system to identify and assess risks to the infrastructure, its expected life and performance.


Project Highlights
More Environmental Projects
See all projects

Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill

Environmental
Phase II Environmental Site Assessment, Historical Downtown Whitehorse

Environmental
Data System Planning

Fish, Wildlife & Ecosystems
Regional Wildlife Monitoring Plan

Transportation
Miette Hot Springs Culvert and Bridge Replacement

Environmental
Contamination Management, Valley Line LRT

Environmental
Environmental Screening, Clearance Reporting and Post-Reclamation Construction Monitoring on Line 21

Environmental
Sicamous to Armstrong Rail Trail Agricultural Component

Transportation
Regulatory Application and Approvals, Valley Line LRT

Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design

Environmental
Coldstream Ranch Gravel Extraction and Reclamation Plan

Environmental
Environmental Assessments, Southeast BC

Environmental
Meadow Valley Groundwater Availability Study

Environmental
Phase I and II Environmental Site Assessments and Compliance Audit Great Glacier Salmon Plant and Camp

Transportation
Technical Expert for Deerfoot Trail Improvements Procurement and Delivery Process
LEADERSHIP INSIGHTS
See all insights







