Associated Engineering completed the detailed design of the 22.5 ML Phase 1 Clayton Reservoir. This reservoir replaces an aging and undersized 7.5 ML circular tank.
Hydraulic constraints dictated that the majority of the new reservoir structure projects significantly above grade.
Our involvement began in 2011 with a review of two adjacent sites for the placement of the new reservoir. Through extensive liaison, we were able to arrive at a solution that would meet Metro Vancouver’s requirements for long-term planning and operation, and the City of Surrey’s desire to maximize the area for a planned neighbourhood Hazelgrove Park. Upon successful property negotiation and realignment of the project site, Metro Vancouver retained Associated Engineering to undertake the preliminary and detailed design of the new two-cell 22.5 ML reservoir.
Project Highlights
Associated Engineering has provided on-going technical support to Metro Vancouver, as well as public consultation support services for the City of Surrey’s Parks and Engineering Department. We also developed an innovative architectural and landscape concept to mitigate the reservoir’s height and massing. This project will enhance the existing reservoir site by restoring the project area and integrating it with the surrounding community and Hazelgrove Park. The reservoir will become a functional public asset, and will be approachable without fences or barriers.
People on this project
More Infrastructure Projects
See all projects
Land Development
Blackwolf Community Development
Transportation
184 Street and Yellowhead Trail Interchange
Infrastructure
Kahkewistahaw Landing
Bridges
Moody Street Overpass
Environmental
Community-Based Monitoring Software Project
Downtown and Main Street Revitalization
West Rossdale Redevelopment
Transit
SkyTrain Fraser River Crossing North Approach Spans
Infrastructure
Big Dock and Water Front Area Redevelopment
Infrastructure
Drainage Improvement Study
Transportation
Bellevue Creek Bridge
Infrastructure
Mosquito Creek Marina Spirit Trail
Infrastructure
West Calgary Storm Sewer Relief
Infrastructure
Burnaby Lake Rowing Club Pavilion Floating Dock
Transportation
Don River Blvd. Bridge Rehabilitation
Infrastructure
Johnston Canyon Campground Upgrades
LEADERSHIP INSIGHTS
See all insights