Associated Engineering completed the detailed design of the 22.5 ML Phase 1 Clayton Reservoir. This reservoir replaces an aging and undersized 7.5 ML circular tank.
Hydraulic constraints dictated that the majority of the new reservoir structure projects significantly above grade.
Our involvement began in 2011 with a review of two adjacent sites for the placement of the new reservoir. Through extensive liaison, we were able to arrive at a solution that would meet Metro Vancouver’s requirements for long-term planning and operation, and the City of Surrey’s desire to maximize the area for a planned neighbourhood Hazelgrove Park. Upon successful property negotiation and realignment of the project site, Metro Vancouver retained Associated Engineering to undertake the preliminary and detailed design of the new two-cell 22.5 ML reservoir.
Project Highlights
Associated Engineering has provided on-going technical support to Metro Vancouver, as well as public consultation support services for the City of Surrey’s Parks and Engineering Department. We also developed an innovative architectural and landscape concept to mitigate the reservoir’s height and massing. This project will enhance the existing reservoir site by restoring the project area and integrating it with the surrounding community and Hazelgrove Park. The reservoir will become a functional public asset, and will be approachable without fences or barriers.
People on this project
More Infrastructure Projects
See all projects
Environmental
Tlichǫ Cultural Commons Digital Database
Bridges
Engineering services for Houston Forest Products
Infrastructure
Big Dock and Water Front Area Redevelopment
Infrastructure
North Interceptor Sanitary Trunk
Infrastructure
Oakville Fourth Line Closed Landfill
Infrastructure
Roads and Drainage Construction, Lake Babine Nation
Transportation
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Infrastructure
Rosehill Reservoir Rehabilitation
Infrastructure
Tsawwassen Mills Mall
Water
Jericho Reservoir
Infrastructure
Drainage Improvement Study
Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion
Infrastructure
West Edmonton Sanitary Sewer Tunnel W12
Infrastructure
Gold Bar Wastewater Treatment Plant
Strategic Advisory Services
Peterborough Streetlight Condition Assessment
LEADERSHIP INSIGHTS
See all insights