Associated Engineering completed the detailed design of the 22.5 ML Phase 1 Clayton Reservoir. This reservoir replaces an aging and undersized 7.5 ML circular tank.
Hydraulic constraints dictated that the majority of the new reservoir structure projects significantly above grade.
Our involvement began in 2011 with a review of two adjacent sites for the placement of the new reservoir. Through extensive liaison, we were able to arrive at a solution that would meet Metro Vancouver’s requirements for long-term planning and operation, and the City of Surrey’s desire to maximize the area for a planned neighbourhood Hazelgrove Park. Upon successful property negotiation and realignment of the project site, Metro Vancouver retained Associated Engineering to undertake the preliminary and detailed design of the new two-cell 22.5 ML reservoir.
Project Highlights
Associated Engineering has provided on-going technical support to Metro Vancouver, as well as public consultation support services for the City of Surrey’s Parks and Engineering Department. We also developed an innovative architectural and landscape concept to mitigate the reservoir’s height and massing. This project will enhance the existing reservoir site by restoring the project area and integrating it with the surrounding community and Hazelgrove Park. The reservoir will become a functional public asset, and will be approachable without fences or barriers.
People on this project
More Infrastructure Projects
See all projects
Infrastructure
Saskatoon South East Water Supply System Canal Rehabilitation
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
Infrastructure
West Calgary Storm Sewer Relief
Water
Jericho Reservoir
Infrastructure
Mosquito Creek Marina Spirit Trail
Computational Fluid Dynamics Analysis
E.L. Smith Water Treatment Plant Upgrade
Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass
Airports
Inuvik Airport Runway Extension and Airside Civil Infrastructure Improvements
Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion
Infrastructure
Lakeshore Drive Redevelopment
Strategic Advisory Services
East Side Pump Station Asset Management Plan
Transportation
Sutherland Ave Pedestrian Bridge
Water
Fort Chipewyan Water Treatment Plant Expansion
Transportation
Cold Lake CRISP
Environmental
Splatsin Eagle River Compensation Site Identification Site
LEADERSHIP INSIGHTS
See all insights