Associated Engineering completed the detailed design of the 22.5 ML Phase 1 Clayton Reservoir. This reservoir replaces an aging and undersized 7.5 ML circular tank.
Hydraulic constraints dictated that the majority of the new reservoir structure projects significantly above grade.
Our involvement began in 2011 with a review of two adjacent sites for the placement of the new reservoir. Through extensive liaison, we were able to arrive at a solution that would meet Metro Vancouver’s requirements for long-term planning and operation, and the City of Surrey’s desire to maximize the area for a planned neighbourhood Hazelgrove Park. Upon successful property negotiation and realignment of the project site, Metro Vancouver retained Associated Engineering to undertake the preliminary and detailed design of the new two-cell 22.5 ML reservoir.


Project Highlights
Associated Engineering has provided on-going technical support to Metro Vancouver, as well as public consultation support services for the City of Surrey’s Parks and Engineering Department. We also developed an innovative architectural and landscape concept to mitigate the reservoir’s height and massing. This project will enhance the existing reservoir site by restoring the project area and integrating it with the surrounding community and Hazelgrove Park. The reservoir will become a functional public asset, and will be approachable without fences or barriers.
People on this project
More Infrastructure Projects
See all projects

Environmental
Community-Based Monitoring Software Project

Water
Fort Chipewyan Water Treatment Plant Expansion

Bridges
SkyTrain Grandview Cut Structural Upgrade

Airports
Christina Lake Infrastructure Upgrading

Streetscaping
Vanalman Avenue Upgrades

Energy
New Central Library Direct Energy Service Connection and Energy Transfer Station

Transportation
Haisla Bridge Replacement

Transportation
Bellevue Creek Bridge

Land Development
Royal Bay Subdivision

Environmental
Phase I Environmental Site Assessment of 10 Housing Units

Infrastructure
Glenmore Landfill Entrance

Water Treatment
Russell Binscarth Water Treatment Plant

Infrastructure
Tsawwassen First Nation Sewage Treatment Plant

Environmental
Growth and Economic Development Strategy

Building Structures
Broadview Drive Commercial Development
LEADERSHIP INSIGHTS
See all insights