Location
Surrey, British Columbia
Expertise
Infrastructure
Water Supply, Storage, & Distribution
Land Use & Community Planning
Landscape Architecture
Parks & Recreation
Wastewater Collection & Storage
Share
Associated Engineering completed the detailed design of the 22.5 ML Phase 1 Clayton Reservoir. This reservoir replaces an aging and undersized 7.5 ML circular tank.
Hydraulic constraints dictated that the majority of the new reservoir structure projects significantly above grade.
Our involvement began in 2011 with a review of two adjacent sites for the placement of the new reservoir. Through extensive liaison, we were able to arrive at a solution that would meet Metro Vancouver’s requirements for long-term planning and operation, and the City of Surrey’s desire to maximize the area for a planned neighbourhood Hazelgrove Park. Upon successful property negotiation and realignment of the project site, Metro Vancouver retained Associated Engineering to undertake the preliminary and detailed design of the new two-cell 22.5 ML reservoir.


Project Highlights
Associated Engineering has provided on-going technical support to Metro Vancouver, as well as public consultation support services for the City of Surrey’s Parks and Engineering Department. We also developed an innovative architectural and landscape concept to mitigate the reservoir’s height and massing. This project will enhance the existing reservoir site by restoring the project area and integrating it with the surrounding community and Hazelgrove Park. The reservoir will become a functional public asset, and will be approachable without fences or barriers.
People on this project
More Infrastructure Projects
See all projects

Infrastructure
Drainage Improvement Study

Infrastructure
Raw Water Supply – Pipeline River Crossing

Land Use & Community Planning
Glory Hills Area Structure Plan

Transportation
Overlea Blvd. Bridge Rehabilitation

Airports
Inuvik Airport Runway Extension and Airside Civil Infrastructure Improvements

Land Development
Royal Bay Subdivision

Computational Fluid Dynamics Analysis
E.L. Smith Water Treatment Plant Upgrade

Transportation
Coast Meridian Overpass

Environmental
Phase I Environmental Site Assessment of 10 Housing Units

Infrastructure
Fringe Area Development Assessment

Infrastructure
Municipal Incentives to Attract Downtown Investment

Infrastructure
Wildfire Infrastructure Rehabilitation Program

Infrastructure
Gold Bar Wastewater Treatment Plant

Transportation
Glenmore Dam Utility Relocation

Infrastructure
Kluskus Village Domestic Water System Improvements
LEADERSHIP INSIGHTS
See all insights