Location
Alexis Nakota Sioux Nation, Alberta
Expertise
Buildings
Building Mechanical
Electrical Instrumentation & Controls
Share
Associated Engineering, in cooperation with ONPA Architects Ltd., was retained to provide engineering and architectural design and consulting services for the proposed upgrades to the Alexis Nakota Sioux Nation School.
AE’s work included civil, structural, mechanical and electrical engineering. As a renovation project, we worked closely with the contractor, the school leadership and board, Council and INAC to adjust the scope as we progressed. This approach allowed the work to be tailored to best suit the needs of the users, the students and staff. Associated was able to achieve good value for the budget by using a Construction Management project delivery system, which provided excellent flexibility.
The completed project has helped to provide new life to the existing school facility, while dramatically improving safety, comfort and the learning environment. Upgrades included a heating and ventilation retrofit, domestic hot water heating refurbishment, a new HVAC control system, lighting and power system upgrades, building envelope improvements, drainage improvements, door hardware replacement, gym flooring replacement and other comfort and safety related improvements.

Client
Alexis Nakota Sioux Nation

Project Highlights
K-12
School
180
Students
More Buildings Projects
See all projects

Water
Fort Chipewyan Water Treatment Plant Expansion

Pump Stations
Horseshoe Slough Drainage Pump Station

Buildings
Simon Fraser University Parcel 21

Infrastructure
Gitwinksihlkw Water Treatment Plant

Infrastructure
Livestock and Forage Centre of Excellence

Buildings
Manitoba Hydro – Keeyask Camp

Buildings
Wood Innovation and Design Centre

Buildings
Little Learners Academy

Strategic Advisory Services
East Side Pump Station Asset Management Plan

Buildings
Corix Biomass Energy Centre

Pump Stations
12th Avenue Drainage Pump Station

Buildings
Misericordia Community Hospital Electrical Upgrades

Buildings
Heron Hall

Infrastructure
Rosehill Reservoir Rehabilitation

Buildings
Climate Change Risk Assessment for Buildings
LEADERSHIP INSIGHTS
See all insights



