Location
Canmore, Alberta
Expertise
Transportation
Bridges
Bridge Asset Management & Inspection
Infrastructure
Asset Management
Share
Associated Engineering was retained by the Town of Canmore to provide inspection and management services of the Town’s bridge inventory, comprised of 32 structures, over a five-year period (2016-2020).
The bridge management services included:
- Completion of Level 1 (visual) inspections of each bridge
- Additional Level 2 (timber coring) inspections
- Recommendations on maintenance and rehabilitation work arising from the inspection program
- Advice on prioritizing future capital and maintenance work, including Life Cycle Costing.
Client
Town of Canmore
Project Highlights
32
Different Structures
Following the completion of all visual inspections, a final report was prepared which summarized the findings and provided maintenance/repair recommendations for each bridge.
Associated Engineering created a five-year maintenance plan detailing the individual repairs for each bridge, including cost and priority.
Finally, a life-cycle cost analysis was carried out using the maintenance costs and estimated replacement cost per year of each structure.
More Transportation Projects
See all projects
Transportation
Pedestrian Bridge 151 Rehabilitation
Transportation
Kitsault Mine Access Road and Bridge Assessments
Transportation
Ray Gibbon Drive Twinning
Transportation
Calgary Airport Runway and Tunnel
Transportation
Vancouver International Airport Rainwater Harvesting
Transportation
Whitemud Creek Oxbow Boardwalk
Transportation
Medicine Hat Boardwalk Replacements
Roads
Johnson-Mariner Way Connector
Infrastructure
Johnston Canyon Campground Upgrades
Airports
Calgary Airport Glycol Treatment Facility
Transportation
Coast Meridian Overpass
Streetscaping
Nigel Valley Public Spaces
Transportation
Still Creek Pedestrian Bridge Replacement
Streetscaping
Vanalman Avenue Upgrades
Transportation
Shell Canterra Road
LEADERSHIP INSIGHTS
See all insights