Location
Camrose, Alberta
Expertise
Bridges
Share
The existing ageing Park pedestrian bridge over Camrose Creek was replaced in 2015 as part of the the City of Camrose’s Trunk Sewer Replacement Project.
This critical trunk sewer location included a convergence of sanitary flows from central and west Camrose. Located in the Camrose Creek valley, the trunk sewer route traversed through Jubilee Park, which is a well-manicured recreation destination located in the heart of Camrose. The park includes mature trees, paved walking paths, picnic shelters and a playground. As the alignment of the existing trunk sewer in this segment was found to be in conflict with these existing features, replacement of the trunk at its existing location was not feasible. Multiple trunk routes and modes of construction were therefore assessed, and determined that a west trunk sewer alignment, which eliminated conflicts with many Park features was the most viable solution.


Project Highlights
16m
span
The chosen route required a bridge crossing for the sanitary sewer pipe at the location of the existing Park pedestrian bridge. The pipe and pedestrian crossing were combined in one bridge structure.
The bridge has a 16 m span over Camrose Creek and includes two steel girders and a precast concrete deck. Handrails matching the theme for the overall park were included and the trunk sewer is supported between the steel girders, keepign a clean aesthetic feel in the park setting. Although the Creek crossing was designed to withstand a 1:100 year storm event, adjacent Park surface was regraded to permit emergency Creek overflow in case of extreme weather events.
More Bridges Projects
See all projects

Transportation
John Hextall Bridge Rehabilitation

Transportation
Whitemud Creek Oxbow Boardwalk

Transportation
Duggan Bridge Replacement

Transportation
Waterton National Park Trail Bridge Replacements

Bridges
Sucker River Bridge Replacement

Bridges
Rossdale Bridge Rehabilitation

Bridges
Willingdon Avenue Overpass Seismic Retrofit

Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection

Bridges
Knight Street Bridge Upgrading

Transportation
Haisla Bridge Replacement

Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments

Bridges
Lake City Overhead Seismic Retrofit and Structural Rehabilitation

Bridges
St. Paul’s Bridge Load Rating and Analysis

Transportation
Kitsault Mine Access Road and Bridge Assessments

Bridges
Deh Cho Bridge, Quality Management Services
LEADERSHIP INSIGHTS
See all insights