The Calgary Zoo was inundated with water during the June 2013 flooding in Calgary, AB.
Following the flood event, Associated was selected as part of a team to develop a flood protection plan for St. George’s Island, where the zoo is located. To inform the design of flood protection infrastructure for the zoo, the project team completed groundwater monitoring, sampling, and numerical modelling. Groundwater and surface water quality samples provided key information to understand surface groundwater interactions.
Groundwater quality sampling helped to identify characteristics of groundwater aquifers flowing into the island. Associated’s contribution and modelling results helped determine the effectiveness of various engineering solutions and to define what would be required to protect the zoo from future flood events.

Client
City of Calgary
Awards
Consulting Engineers of Alberta, Award of Excellence; Consulting Engineers of Alberta, Award of Merit

Project Highlights
More Climate Change Adaptation & Mitigation Projects
See all projects

Climate Change Adaptation & Mitigation
Livingston Trail Environmental Control Facility

Buildings
Climate Change Risk Assessment for Buildings

Environmental
Big Bend Master Drainage Plan

Climate Change Adaptation & Mitigation
Emergency Flood Damage Reduction Program

Environmental
Climate Change Risk Assessment

Environmental
John Matthews Creek Ravine Management Strategy and Creek Restoration

Environmental
Port of Vancouver – Climate Change Adaptation

Transportation
Pitt River Bridge

Climate Change Adaptation & Mitigation
Highway 40 Emergency Flood Reconstruction

Climate Change Adaptation & Mitigation
RISC Hydrometric Standards Review

Environmental
Growth and Economic Development Strategy

Climate Change Adaptation & Mitigation
Climate Change Adaptation Scenario Development and Vulnerability and Risk Assessment

Climate Change Adaptation & Mitigation
Fraser River Foreshore – Reach 9 Dyke

Climate Change Adaptation & Mitigation
Toronto Water Quality Master Plan

Environmental