Location
Calgary, Alberta
Expertise
Transit
Urban Drainage
Wastewater Collection & Storage
Share
The Calgary Green Line South East has long been discussed as a public transit solution for Calgary’s south east population.
In mid-2014, a consultant team which included Associated Engineering who provided stormwater and utility designs, was awarded the contract to further the design from functional planning stage to the end of preliminary design.
The route was initially a Bus Rapid Transit with the intent that the route will be converted to a low-floor Light Rail Transit in the future when ridership has been established. The line runs from downtown Calgary to Seton in the southeast, a distance of 26 kilometres.
Associated Engineering provided coordination for major utility conflict identification and undertook preliminary stormwater designs for the full length of the corridor, including through the historic neighbourhoods of Inglewood, Ramsay, and Ogden and newer city subdivisions. Several route corridors were assessed as the overall project developed.
Project Highlights
More Transit Projects
See all projects
Transportation
Medicine Hat Transit ITS Decision Support
Building Structures
Oliver Bowen Light Rail Vehicle Storage and Maintenance Facility
Transportation
St. Albert Transportation Master Plan
Environmental
Environmental Planning, Valley Line LRT
Environmental
Contamination Management, Valley Line LRT
Transit
SkyTrain Fraser River Crossing North Approach Spans
Transit
Broadway Subway
Transportation
Regulatory Application and Approvals, Valley Line LRT
Transportation
Edmonton Valley Line – Stage 1
Building Mechanical
St. Albert Naki Transit Centre and Park & Ride
Intelligent Transportation Systems
Red Deer Transit – Intelligent Transportation Systems (ITS) Project Charters
Transit
SkyTrain Crossing of South Point Drive
Bridges
SkyTrain Grandview Cut Structural Upgrade
LEADERSHIP INSIGHTS
See all insights