Brine Pond Construction

Location

Ft. Saskatchewan, Alberta

Expertise

Containment Systems

KEYERA Energy retained Associated Engineering to provide engineering design and project management services for the construction of a new brine pond located at their Ft. Saskatchewan plant site.

The plant site has two existing brine ponds. The expansion of their plant operation required additional on-site brine storage; the new pond would provide KEYERA with a storage capacity of up to 615,000 m3.

The project began with engineering design and industrial application to Alberta Environment for regulatory approvals. The pond containment system is an 80 millimetre high density polyethylene (HDPE) primary liner, a geonet leak detection layer, a 60 millimetre HDPE secondary liner, and sub-drain system to control the local groundwater flow. The interconnection that ties the new pond to the plant is a brine transfer line that fills and drains the pond, and a newly dedicated pump that functions with the existing pump system.

Throughout the project, Associated Engineering provided on-site engineering support and project management to ensure project success.

Map Image
Blue Section

Project Highlights

Green Section

Careers

A career step in the right direction

We are recognized as one of Canada’s Best Managed Companies for 14 consecutive years but our achievements and reputation are only possible because of our amazing staff. We believe that a supported staff allows them to excel at what they do best, and provide the best possible service to our clients and communities.