Belle River Water Treatment Plant

Location

Lakeshore, Ontario

Expertise

Buildings

Electrical Instrumentation & Controls

Water

Water Treatment

Conceptual, Preliminary and detailed design, as well as construction contract administration services were provided by Associated Engineering to expand and upgrade this 18,200 m³/day (4.0MIGD) water treatment plant.

The expanded plant supplies the Town of Lakeshore with 27,300 m³/day (6.0MIGD) from Lake St. Clair to meet the demand for a 20-year projected population. A number of plant components were sized to meet the projected 40-year demand of 36,400 m³/day (8.0MIGD).

The proposed expansion included the following electrical and instrumentation upgrades:

  • Outdoor high voltage 1500kVA transformer, disconnect switch, and indoor switchgear
  • Three new MCC line ups for Water Treatment Plant, High Lift Pumping Station and Low Lift Pumping Station
  • HVAC and lighting design through the plant
  • Process control systems including 10 new PLCs.

Preliminary design was completed in September 2004 and detailed design in November 2005. Construction of this project was completed by the fall of 2008 at a capital cost of $30 million.

Map Image

Client

The Town of Lakeshore

Blue Section

Project Highlights

1500kVA

transformer

$30M

capital cost

Green Section

Careers

A career step in the right direction

We are recognized as one of Canada’s Best Managed Companies for 14 consecutive years but our achievements and reputation are only possible because of our amazing staff. We believe that a supported staff allows them to excel at what they do best, and provide the best possible service to our clients and communities.