Avenue Road Watermain

Location

Toronto, Ontario

Expertise

Pipelines

Water Supply, Storage, & Distribution

As part of their Watermain Management Program and the Toronto-York Region “Joint Optimization Study,” Toronto Water determined that the existing cast iron watermain (Main 20) along Avenue Road should be replaced to increase security of supply, and improve system hydraulic performance.

Associated Engineering was retained to design the replacement watermain, which consisted of approximately 3.5 km of 900 mm diameter and 2.1 km of 750 mm diameter pipe. The new watermain alignment is located predominantly along Avenue Road, starting at the City’s High Level Pumping Station located on Cottingham Street, and extending to the connection point located at Avenue Road and Caribou Road.

Map Image

Client

Toronto Water

Blue Section

Project Highlights

2.8km

open cut installation

2.8km

tunnelling installation

Associated Engineering provided project management, contract administration and inspection services throughout the 2.5-year construction period. The final design allowed the existing main to remain in operation until the appropriate connections to the new system could be made. Included were three trunk watermain and fifteen branch connections. The final design included 2.8 km of open cut installation and 2.8 km of tunnelling installation, requiring both pipejacking/hand mining and microtunnelling techniques.

Green Section

Careers

A career step in the right direction

We are recognized as one of Canada’s Best Managed Companies for 14 consecutive years but our achievements and reputation are only possible because of our amazing staff. We believe that a supported staff allows them to excel at what they do best, and provide the best possible service to our clients and communities.