The City of Saskatoon engaged Associated Engineering in conjunction with CH2M Hill to complete the preliminary design, detailed design, and construction administration services for upgrades that include a new treated water storage reservoir, high lift pump station, and ultraviolet disinfection.
The primary objective of the project is to provide sufficient storage to allow the plant to be operated at a constant maximum day flow rate rather than rapidly changing plant production levels to meet peak hour demands. Given the limited availability of land around the existing Water Treatment Plant site, the new reservoir design contained a number design challenges to meet the required storage objectives, which included property constraints, proximity to the existing reservoir, ground conditions, and maintaining traffic.
Client
City of Saskatoon
Project Highlights
$35
Million
More Pump Stations Projects
See all projects
Buildings
Riel Recreation Park Redevelopment
Pump Stations
Barnston/Maple Ridge Pump Station
Pump Stations
Faulkner Lift Station
Electrical Instrumentation & Controls
Solar Photovoltaic System Installation – WTP and Pumphouse
Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment
Electrical Instrumentation & Controls
La Ronge and Air Ronge Municipal Utilities Back-Up Power
Building Mechanical
Craigflower Pump Station
Building Mechanical
Scott Street Sewage Pumping Station Upgrades
Pump Stations
Skyline Pump Station
Pump Stations
Homer Watson Pump Station Upgrade
Strategic Advisory Services
East Side Pump Station Asset Management Plan
Building Structures
Columbia Street Pump Station
Computational Fluid Dynamics Analysis
City of Saskatoon Reservoir and Pump Station Upgrades – CFD modelling
Computational Fluid Dynamics Analysis
Saskatoon Raw Water Intake & Pump Station
Energy