Associated Engineering and Koers & Associates Engineering partnered on the design and construction administration of the Town of Ladysmith’s new Arbutus Reservoir in 2006.
Following this milestone, the Town required upgrades to their water treatment facility to replace the aging chlorination equipment and bring it into compliance with Island Health’s 4-3-2-1 Policy.
The upgrade to the water treatment facility proceeded in two phases. In Phase 1, two existing chlorine gas systems were replaced with a centralized chlorination facility located adjacent to the reservoir. The facility housed the pump room, chlorination room and electrical room under a single-story masonry structure. Phase 1 was designed to be upgraded in the future to accommodate additional treatment processes. Design for Phase 1 started in 2010 and construction for Phase 1 was completed in 2014.
In Phase 2, treatability studies were conducted and dissolved air flotation (DAF) and membrane technologies were selected as the preferred treatment processes. As part of the Phase 2 upgrades, the water treatment facility is expanded to house the DAF pre-treatment tank, membrane trains, control room, as well as the PACl and soda ash storage facilities. A pre-engineered steel structure is constructed adjacent to the existing chlorination facility with the appropriate seismic gaps and doorways to access the two phases of the facility. Phase 2 also consists of the construction of concrete tanks for residuals management.
Associated Engineering and Koers & Associates Engineering provided the engineering services and construction administration services. The architectural services were provided by Local Practice.
Construction commenced in Summer 2018 and the facility was commissioned in Summer 2020. The upgrades to the facility allow the Town to meet the BC Surface Water Treatment Objectives.


Project Highlights
More Building Mechanical Projects
See all projects

Building Mechanical
Eiling Kramer Campground Park Service Centre

Infrastructure
Pelham Patrol Yard Fuel Tank Replacement

Buildings
Stoney Nakoda Child & Family Services Building Assessment

Building Mechanical
Martensville Athletic Pavillion

Building Mechanical
Residuals Treatment Facility

Infrastructure
Tsawwassen First Nation Sewage Treatment Plant

Building Mechanical
Yard Works Facility Emergency Backup Generator

Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs

Building Mechanical
Oakmont Pump Station Upgrades

Building Mechanical
Hazardous Materials Survey and Abatement Monitoring

Building Mechanical
Elijah Smith School Energy Audit

Building Mechanical
Woodward WWTP Headworks Biofilter Upgrades

Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study

Building Mechanical
Craigflower Pump Station

Building Mechanical
Athabasca Regional Service Centre, Administration Building
LEADERSHIP INSIGHTS
See all insights