Location
Fort McMurray, Alberta
Expertise
Share
For several years, Associated Engineering as a prime consultant has been providing on-going assistance with the Instrumentation and Controls operations of the Fort McMurray Wastewater Treatment Facility and Lift Stations within the RMWB.
This work included the control system design, PLC and SCADA programming and equipment upgrades with minimal impact to operations.
Support and upgrades work has included:
- PLC, SCADA and operational support since facility commissioning in 2009 through monthly on-site visits
- Implementation of HACH WIMs laboratory software and integration with SCADA Historian
- WWTP – New Septage Receiving Station PLC & HMI programming
- Lift Station – PLC, HMI and backup controller design, programming, and commissioning
- Plant PLC Upgrades Design – ACP-14, -23 and -52


Project Highlights
More Energy Projects
See all projects

Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study

Energy
ENMAX District Energy Centre

Energy
Minoru Aquatic Complex

Energy
Liquefied Natural Gas for Electrical Generation

Climate Change Adaptation & Mitigation
Nanaimo Reservoir No. 1 and Energy Recovery Facility

Energy
New Central Library Direct Energy Service Connection and Energy Transfer Station

Energy
British Columbia Lottery Corporation Geoexchange Feasibility Study

Energy
District Energy – Blatchford Redevelopment

Energy
Solar Feasibility Study for Medicine Hat Reservoirs

Energy
Gateway Theatre Wastewater Heat Recovery

Electrical Instrumentation & Controls
Solar Photovoltaic System Installation – WTP and Pumphouse

Buildings
Residuals Treatment Facility

Energy
Solar Photovoltaic System Installation

Building Mechanical
Elijah Smith School Energy Audit

Energy