Location
Summerland, British Columbia
Expertise
Infrastructure
Water Resources
Irrigation
Water Supply, Storage, & Distribution
Share
Since 1910, the District of Summerland has owned and operated the municipal water supply system that serves domestic and irrigation water users within the District.
The system includes ten earth dams and one concrete arch dam. The dams are used to impound spring runoff water.
In 1997, the District retained a team including Associated Engineering to perform safety appraisals of the dams. This study included comprehensive site inspections and assessments, structural and seismic analysis of the concrete dam and spillway, flood hazard assessment, concrete materials assessment of the dam and spillway, assessment of the rock abutment stability, and cost estimates for proposed rehabilitations and upgrades.
Project Highlights
More Infrastructure Projects
See all projects
Infrastructure
Drainage Improvement Study
Infrastructure
Saskatoon South East Water Supply System Canal Rehabilitation
Environmental
Splatsin Eagle River Compensation Site Identification Site
Infrastructure
Gregoire Sanitary Sewer
Infrastructure
Raw Water Supply – Pipeline River Crossing
Building Structures
Broadview Drive Commercial Development
Environmental
Climate Change Risk Assessment
Infrastructure
Burnaby Lake Rowing Club Pavilion Floating Dock
Infrastructure
Oakville Fourth Line Closed Landfill
Infrastructure
Livestock and Forage Centre of Excellence
Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
Environmental
Tlichǫ Cultural Commons Digital Database
Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study
Strategic Advisory Services
Peterborough Streetlight Condition Assessment
Bridges